Current metal surcharges

for application outside of Germany please contact the responsible representation

Please enter part no. and your discount (if applicable).

Nº da peça

Please enter 5-digit number

Discount

(%)

Net price per piece 1.523,49
current metall surcharge per piece 52,47
your current price per piece 1.575,96
pack size 1 pcs.

Market data as per:: 17.06.2024

Daily quotation Calculation basis
Copper LMEm (modified)
   LMEm = LME in € + 1,5%
915,91 €/100 kg 200,00 €/100 kg
Brass Ms 63/37 852,00 €/100 kg 185,00 €/100 kg
Silver, processed 1.021,60 €/1 kg 180,00 €/1 kg

Configuration

Peso Cu 6,786 kg
peso bronze 0,027 kg
Peso Ag 4,41 g
Copper surcharge 48,5817
Brass surcharge 0,1801
Silver surcharge 3,7115
List price per piece 1.523,49
Net price per piece 1.523,49

01439

CRITO®185Power
trilho de conexão
3 polos
para 3 conectores de cabo 300 mm² (arranjo em deslocamento), para 4 conectores de cabo 240 mm² ou lam. Cu 80 x 10

Encontre sua pessoa de contato

Para a página de contato

Wöhner Sistemas
Eletrotécnicos Ltda.
Rua Antônio Galvão Pacheco, 185
18550-612, Boituva/SPl
Brasil

Linha direta de pedidos (Alemanha)
+49 9563 751 125
order@woehner.de

Linha direta de tecnologia (Alemanha)
+49 9563 751 508
support@woehner.com

Produtos Configurador Current metal surcharges folder for files